DAEEP – Dhaka-Ashulia Elevated Expressway Project
- Construction of Reinforced Earth (RE) Wall at DAEEP - Dhaka-Ashulia Elevated Expressway Project
- BBA - Bangladesh Bridge Authority, Jiangsu Provincial Transportation Engineering Group Co. (JTEG), Major Bridge Engineering Company of China (MBEC), China Railway 16th Bureau Group Co., Ltd. - CRCC 16
- Section 1 , Section 2, Section 3
- Total Approach Road Ramp 30, Reinforced Earth Area 30,000 Sqm
- Geotechnical & Site Works – Soil investigation, excavation, and subgrade preparation Structural & Reinforcement Works – Supply and installation of geogrids/metallic strips, facing panels, and reinforced concrete foundations Backfilling & Compaction – Layered granular backfill with mechanical compaction Drainage & Protection – Subsurface drainage, weep holes, capping, and protective layers Finishing & Landscaping – Architectural finishes, texturing, and integration with surroundings Testing & Quality Control – Compaction testing, alignment inspection, and performance verification
- June 2024 to Ongoing