H-930, R-13, Avenue: 03, Mirpur DOHS, Dhaka

DAEEP – Dhaka-Ashulia Elevated Expressway Project

DAEEP – Dhaka-Ashulia Elevated Expressway Project

  • Construction of Reinforced Earth (RE) Wall at DAEEP - Dhaka-Ashulia Elevated Expressway Project
  • BBA - Bangladesh Bridge Authority, Jiangsu Provincial Transportation Engineering Group Co. (JTEG), Major Bridge Engineering Company of China (MBEC), China Railway 16th Bureau Group Co., Ltd. - CRCC 16
  • Section 1 , Section 2, Section 3
  • Total Approach Road Ramp 30, Reinforced Earth Area 30,000 Sqm
  • Geotechnical & Site Works – Soil investigation, excavation, and subgrade preparation Structural & Reinforcement Works – Supply and installation of geogrids/metallic strips, facing panels, and reinforced concrete foundations Backfilling & Compaction – Layered granular backfill with mechanical compaction Drainage & Protection – Subsurface drainage, weep holes, capping, and protective layers Finishing & Landscaping – Architectural finishes, texturing, and integration with surroundings Testing & Quality Control – Compaction testing, alignment inspection, and performance verification
  • June 2024 to Ongoing

Categories

Cart
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare